Specifications of the agnion Heatpipe-Reformer
Fuel: | Wood pellets, wood chips P16 (G30), wood waste, landscaping material and other solid biomass |
Fuel requirements: | 2,500 t/y (2,000 t bone dry / year) |
Plant output: | |
Electricity: | Rated output 400 kW |
Heat: | Rated output 630 kW at 90°C / 70°C level |
Utilization: | Injection into local and district heating grids |
Provision of heat for industrial plants (process heat) | |
Drying (e.g. wood, sewage sludge) | |
Chiller operation (e.g. absorption chiller) | |
and further applications | |
Control: | Fully automated operation, also through remote control station |
Required area: | 300 sqm |
Construction time: | 6 month |
Efficiency
Cold gas efficiency: 70%
Electrical efficiency: 30%
Thermal efficiency: 50%
Total efficiency: 80%
Calorific value syngas: 11,000 kJ/m³, more than double the value of autothermal gasification processes
Approval requirements:
Normally, a standard building licence is sufficient; for example in Germany no permit is required according to BImSchG (Federal Immission Control Act).